ENERGY PROJECT AUDIT

German-Ukrainian company BIT offers comprehensive audit services to investors looking to launch or continue the project implementation.

Project refers to a business idea at various stages of implementation, as well as an energy facility not completed or in operation.

During comprehensive alternative energy project audit German-Ukrainian company BIT carries out the following activities:
  • Analysis of existing documents:
    In-depth analysis of existing project documentation (input data, technical conditions, project design, etc.) for compliance with norms and best practices.
  • Study of the land parcel:
    Collection of basic data on land parcel for preliminary analysis of the project, carrying out topo-geodetic surveys.
  • Analysis of the legal framework:
    determination of the conditions for project implementation in accordance with the current legislation in energy sector;
  • Analysis of existing electrical grids:
    - identification of possible grid connection options (at least two);
    - calculation of grid connection costs;
    - determination of the optimal connection option.
  • Analysis of heating networks:
    - identification of the nearest heat consumers and their demand;
    - identification and analysis of possible options for the heat supply;
    - calculation of the cost of implementing the heat supply scheme.
  • Analysis of the potential of alternative energy source:
    - analysis of the alternative energy source potential (wind speed and direction, solar radiation, quantity and quality of biomass and biogas);
    - determination of the maximum electrical and/or thermal capacity of the plant.
  • Selection of basic equipment:
    - collection of data from manufacturers and suppliers of the main equipment (technical characteristics, price, delivery conditions, warranty service, etc.);
    - analysis of basis equipment option and selection the best option.

 

TRADITIONAL ENERGY PROJECT AUDIT

During comprehensive traditional energy project audit German-Ukrainian company BIT carries out the following activities:

  • Analysis of existing documents:
    In-depth analysis of existing project documentation (input data, technical conditions, project design, etc.) for compliance with norms and best practices.
  • Study of the land parcel:
    Collection of basic data on land parcel for preliminary analysis of the project, carrying out topo-geodetic surveys.
  • Analysis of the legal framework:
    determination of the conditions for project implementation in accordance with the current legislation in energy sector;
  • Analysis of existing electrical grids:
    - identification of possible grid connection options (at least two);
    - calculation of grid connection costs;
    - determination of the optimal connection option.
  • Analysis of heating networks:
    - identification and analysis of possible options for the heat supply;
    - calculation of the cost of implementing each of heat supply scheme;
    - determination of the optimal heat supply option.
  • Analysis of the external gas supply:
    - hydraulic calculation for the selection of pipes and equipment for the construction of the connection to the external gas network;
    - calculation of connection cost to the external gas network.
  • Water supply studies:
    - hydro-geological studies of the possibility of water supply to the object (description of characteristics of aquifers, including the Jurassic aquifer, with indicative characteristics of the chemical composition of water, definition of the geological structure and geostructural features of the Client's land parcel);
    - calculation of the estimated costs for potable and technical water supply.
  • Development of a drainage (wastewater) system:
    - development of a Technical solution for the drainage system, determining the optimum location of the local sewage treatment plant;
    - calculation of the estimated costs of the drainage system.

As a result of audit performing we identify optimal options for connection to external networks, the budget required for the project, the estimated time of implementation and the expected period of commissioning, as well as possible risks.

Therefore, the Client, after receiving the results of the project audit has all the background information to develop an optimal project concept.

 